2013 Vobarno (BS)

Valsir Edificio Produzione Trafile

The new industrial complex provides several buildings placed on two opposite sides of the river Chiese.
These volumes have been adjusted upon the bends of the river unifying the elevations into two curvilinear facades facing one eachother.
Towards the river, lies a unique coating as a single tape to absorb the different buildings beyond it.
Embedded into the two facades are incorporated some horizontal reflecting steel elements that allow entering into architecture some surrounded nature.
projects